| Project Gallery |
|
|
|
|
The following are samples of on site welding or metal frabrication project work carried out by Metalworx Mobile, click on image to view larger version. Modification to a bus subframe to accommodate a new Euro 3 low emission engine.
Pick for a digger altered from a 24 ton to suit a 21 ton machine, new pins and pin centres and bushes to shim the width down.
|